The tub in the Master Bath is fitted.
The tile in Bathroom #1 is finished.
The tile on the floor of the Master Bath is started.
The tile for Bedroom #2 is started.
View from the Living Room towards Sitting Loft.
There are a lot of stair rails that had to be stained.
The tile in Bedroom #3 has started.
Just some of the doors that had to be stained.
Some of the cabinets have arrived. A lot more to come.
The heating system in the floor of the Master Bathroom.