The drainage system is being put in place. This is the pipe that is placed 7 feet down to keep the water from going into the basement. It should take about 1 week to finish putting the drain into place and then maybe a week to get the water out. Then we can get back on course with the build. I will continue to post pictures and possibly some video.
We look forward to many more years of our family and friends having fun together at Mullet Lake. We hope you enjoy watching it grow.
Loading trees to take to the mill.
A pretty good size load.
Surveyors have staked out the house.
Putting in the drainage system.
The water draining out from the drainage pipe.
The view from the dock.
The walk out area of the foundation.
The Basement Bedroom and Den Corner.
The Front Porch and Cold Storage Room beginning.
More Blocks Delivered
Basement walls getting to height.
Door leading into Cold Storage.
Window for the Fitness Area in Basement.
Suppoort Beams and Basement Floors
Preformed 4000 lb. pieces lifted over Storage Room.
Window into basement. You can see the hole inside for the elevator.
Support Columns are built on the Porch.
Doors into Storage under the Porch.
Preparing area for foundation of Garage and Porch.
A blowout of bricks when the column was filled with concrete from the concrete pump.
The joists for the first floor are in place.
Concrete is loaded into the concrete pump.
The concrete is pumped to different places of the house. (Cool)
The base floor of the front porch being poured.
View from the Easement
Foundation for the laundry room and garage is finished
View through the Living Room Windows
Looking towards the kitchen and breakfast area.
Windows in the Breakfast Area
View of the Walkout Patio
View from Shore
More wood for the mill. (Oak)
Back fill has begun.
The garage foundation is filled for pouring of the floor.
The interior walls on first floor have started.
More interior walls.
View from beach. (Walkout end)
View from beach. (Breakfast area and screened porch foundation.)
support beam for the Garage are in place.
Pouring the garage floor.
Beginning the second floor walls.
A nice place for a balcony.
View from the Beach. (6-18-10)
The second floor walls are goin up.
View from the beach (6-22-10)
Interior walls on the second floor are roughed in.
Drilling the wells for the Geothermal System.
Looking out from the second floor sitting area.
Garage Second Floor Walls in Place
Roof of the Water Side Porch being installed.
The roof of the garage is installed.
The roof trusses are put into place.
Queen Ann Returns on the roof corners.
Placing the roof trusses on the tower.
Working on overhang for soffits and facia.
Screened in porch going up.
Shingles going on the roof.
The Sitting Loft area.
The screened in porch still has to be built.
View from the sitting loft.
One of the last mazes of support boards.
View of the driveway area.
Blog Archive
-
►
2011
(5)
- ► 09/04 - 09/11 (1)
- ► 04/10 - 04/17 (1)
- ► 03/27 - 04/03 (1)
- ► 02/20 - 02/27 (1)
- ► 01/23 - 01/30 (1)
-
▼
2010
(21)
- ► 12/26 - 01/02 (1)
- ► 12/05 - 12/12 (1)
- ► 11/21 - 11/28 (1)
- ► 10/17 - 10/24 (1)
- ► 10/10 - 10/17 (1)
- ► 09/19 - 09/26 (1)
- ► 08/29 - 09/05 (1)
- ► 08/22 - 08/29 (1)
- ► 08/01 - 08/08 (2)
- ► 07/18 - 07/25 (1)
- ► 07/04 - 07/11 (1)
- ► 06/20 - 06/27 (1)
- ► 06/13 - 06/20 (1)
- ► 05/30 - 06/06 (1)
- ► 05/23 - 05/30 (1)
- ► 05/09 - 05/16 (1)
- ► 04/25 - 05/02 (1)
- ► 04/11 - 04/18 (1)
- ► 04/04 - 04/11 (1)