The engineer felt that the a drainage system to dry out the site would be very successfull. We are able to have the basement and no changes in the plans due to the water level.
Hopefully, we will be putting in the drainage system next week.
I will attempt to keep everyone aware of the happenings during this fun adventure.
The docks and hoists have been put in with two extra sections to get ready for a fun filled summer while the build continues.