The beams in the living room are installed.
The paneling is installed in the hallway and foyer. This wood is from the trees we cut to build the house.
The tile in the laundry room is finished. All the tile is finished except for the kitchen backsplash.
The kitchen cabinets have been installed.
The kitchen cabinets.
The tub is installed in the master bathroom.
No comments:
Post a Comment