The finish work is starting. The siding is started and sure makes the house look nice. The fireplace is coming along, and all the framing should be done this week. The geothermal furnaces have been delivered and sitting in the mechanical room to be hooked ub. The duct work is started and the electrical walk through is this Friday. Here are some of the new photos.
Delivery of the Geothermal Units.
Cedar Shingle siding being installed.
The base trim with crown molding looks great.The wall vent goes well with trim.
The fireplace in the Living Room is starting to look like a fireplace.
The geothermal units and the water pressure tank are installed into the mechanical room.
I hope to have more pictures of progress of the house build soon.
No comments:
Post a Comment