The Progress on the house is going well!
It is after the 4th of July and the house is fairly close to being on schedule. The second floor of the garage has been walled and ready for the trusses. The temporary stairs are in place. The roof trusses have been placed on the driveway side porch and the water side porch roof mostly. (no shingles)
The geothermal wells are drilled and the back fill will be brought in soon. The trusses are ordered and should be here soon.
I have added a couple more pictures to bring things up to date and will continue to add them as progress continues.