Getting ready to clear the trees and stumps.


Remember the path.

The cutting of the big pines.

A lot of wood chips to use.

A lot of work to clean up the area.

A few of the logs waiting to be made into paneling.

Only one of the wood chip piles. Lots of fun to come.

Lumberjack Cathy!

You can see the lake!

Pages

Loading trees to take to the mill.

Loading trees to take to the mill.

A pretty good size load.

A pretty good size load.

Surveyors have staked out the house.

Surveyors have staked out the house.

Putting in the drainage system.

Putting in the drainage system.

The water draining out from the drainage pipe.

The water draining out from the drainage pipe.

The view from the dock.

The view from the dock.

The walk out area of the foundation.

The walk out area of the foundation.

The Basement Bedroom and Den Corner.

The Basement Bedroom and Den Corner.

The Front Porch and Cold Storage Room beginning.

The Front Porch and Cold Storage Room beginning.

More Blocks Delivered

More Blocks Delivered

Basement walls getting to height.

Basement walls getting to height.

Door leading into Cold Storage.

Door leading into Cold Storage.

Window for the Fitness Area in Basement.

Window for the Fitness Area in Basement.

Suppoort Beams and Basement Floors

Suppoort Beams and Basement Floors

Preformed 4000 lb. pieces lifted over Storage Room.

Preformed 4000 lb. pieces lifted over Storage Room.

Window into basement. You can see the hole inside for the elevator.

Window into basement. You can see the hole inside for the elevator.

Support Columns are built on the Porch.

Support Columns are built on the Porch.

Doors into Storage under the Porch.

Doors into Storage under the Porch.

Preparing area for foundation of Garage and Porch.

Preparing area for foundation of Garage and Porch.

A blowout of bricks when the column was filled with concrete from the concrete pump.

A blowout of bricks when the column was filled with concrete from the concrete pump.

The joists for the first floor are in place.

The joists for the first floor are in place.

Concrete is loaded into the concrete pump.

Concrete is loaded into the concrete pump.

The concrete is pumped to different places of the house. (Cool)

The concrete is pumped to different places of the house. (Cool)

The base floor of the front porch being poured.

The base floor of the front porch being poured.

View from the Easement

View from the Easement

Foundation for the laundry room and garage is finished

Foundation for the laundry room and garage is finished

View through the Living Room Windows

View through the Living Room Windows

Looking towards the kitchen and breakfast area.

Looking towards the kitchen and breakfast area.

Windows in the Breakfast Area

Windows in the Breakfast Area

View of the Walkout Patio

View of the Walkout Patio

View from Shore

View from Shore

More wood for the mill. (Oak)

More wood for the mill. (Oak)

Back fill has begun.

Back fill has begun.

The garage foundation is filled for pouring of the floor.

The garage foundation is filled for pouring of the floor.

The interior walls on first floor have started.

The interior walls on first floor have started.

More interior walls.

More interior walls.

View from beach. (Walkout end)

View from beach. (Walkout end)

View from beach. (Breakfast area and screened porch foundation.)

View from beach. (Breakfast area and screened porch foundation.)

support beam for the Garage are in place.

support beam for the Garage are in place.

Pouring the garage floor.

Pouring the garage floor.

Beginning the second floor walls.

Beginning the second floor walls.

A nice place for a balcony.

A nice place for a balcony.

View from the Beach. (6-18-10)

View from the Beach. (6-18-10)

The second floor walls are goin up.

The second floor walls are goin up.

View from the beach (6-22-10)

View from the beach (6-22-10)

Interior walls on the second floor are roughed in.

Interior walls on the second floor are roughed in.

Drilling the wells for the Geothermal System.

Drilling the wells for the Geothermal System.

Looking out from the second floor sitting area.

Looking out from the second floor sitting area.

Garage Second Floor Walls in Place

Garage Second Floor Walls in Place

Roof of the Water Side Porch being installed.

Roof of the Water Side Porch being installed.

The roof of the garage is installed.

The roof of the garage is installed.

The roof trusses are put into place.

The roof trusses are put into place.

Queen Ann Returns on the roof corners.

Queen Ann Returns on the roof corners.

Placing the roof trusses on the tower.

Placing the roof trusses on the tower.

Saturday, January 1, 2011

THERE HAS BEEN A LOT OF PROGRESS!

The elevator being installed. It still needs to be painted. The wood floor has been installed in it but not shown in this picture.

The screened porch.  The screens and the mantle left to be installed as well as the varnishing of the ceiling.

I am almost finished with the mantle for the screened porch fireplace.

One of the two stones placed on the fireplace in the screened porch.  The two stones are from a church that was built in the mid 1800's in Vietnam.

The wood floor has been laid. It still needs to be sanded, stained, and sealed.

Bedroom #3 is painted.

The view of the floor from the sitting loft.

Bedroom #1 has been painted.

Bedroom #2 has been painted.

The basement bedroom has been painted.

Some of the trim boards that have been stained.

Some of the boards that still need to be stained.

The master bedroom has been painted.

The basement family room fireplace is finished and waiting for the mantle.

Some more of the boards that have been stained.